PSi was engaged to develop a walkway tunnel as an escape route for the 4km bus way tunnel. The project was to develop a 600 metre fully concrete lined tunnel, in clay, under Brisbane city. The project was right in the heart of Brisbane with a busy walk way three metres above working level. This project was completed successfully, with all works carried out inside an underground car park.