Mt Cootha Tunnel Development

Location:

Mt Cootha Brisbane, Australia

Client:

John Holland

Time frame:

7 months

Date:

2014-2015

Status:

Completed

Contract value to date:

$3,800,000

PSi was contracted by John Holland to develop a conveyor tunnel in the heart of Brisbane to remove the spoil from the TBM on the S1 tunnel development into the Mt Cootha quarry. Drill & blast and ground support was required to develop the 100 meter tunnel the project was completed on time and without loss time injury.