PSi was engaged to carry out drilling and blasting of 5000m³ of rock in downtown Airlie Beach with the closest house being 150m from blast. Result excellent. All material was able to be dug with a 20 tonne Excavator and saved approximately 5 months in construction time (if other methods of rock breaking had been […]

APCT X 50 Expansion Project

PSi was engaged for drilling and blasting of 100,000 cubic metres, which was within 600mts of major infrastructure. Performed some secondary blasting of oversize boulders and breakage of some boulders using non explosives products.