Azure Sea Unit Development

PSi was engaged to carry out drilling and blasting of 5000m³ of rock in downtown Airlie Beach with the closest house being 150m from blast. Result excellent. All material was able to be dug with a 20 tonne Excavator and saved approximately 5 months in construction time (if other methods of rock breaking had been […]